So today I got a little done, wasn’t a very busy day because of the glue-up.
TODAY’S ACTIVITIES INCLUDED :
Finished putting the dadoes in the flights.
The Glue-up
DADOES
I finally finished putting all the dadoes in the bottom sides of the flights. As I did previously I put a 1/2” dado stack into the table saw and raised it 1/4” high. Below is a picture of the finished flights, now that all joinery is cut so as that I glue in the sides and then its on to the glue up.
THE GLUE-UP
The glue-up was a lot of fun trying to figure out how I was going to glue up 9 flights at the same time with only 13 clamps. The glue-up consisted of just attaching the two feet into the dadoes I just cut.
My solution was to use the jig that I had just made for the pipe clamps . I used a brace across the pipe clamps that way I could clamp 2 flights back to back and only use 4 clamps for the bottom feet of the flight, then I used the rest of the clamps to secure the tops of the flights, its very complicated but here are some pictures to clarify.
This clamping jig is really versatile otherwise I would have needed to buy a boat load clamps, I could fit 4 flights this way and the other 5 were clamped elsewhere using the back to back method.
NEXT…
I need to do one more finishing sanding and wipe them down
Finally I need to apply a couple coats of oil based Polyurethane.